Details

2017 Year

  • Nov 17

    Provision of Barbed Wire & Wire Mesh Panel to Existing Steel Bar Fencing of railway

    Provision of Improvement to Restaurant at train station

  • Oct 17 - Dec 20

    Term Contract for General Building Repair and Shop Repartitioning Works in Shopping Mall

  • Oct 17

    Additional Staff Facilities and Oval Sign Replacement in train station

    Revitalization Wrapping System to existing Marine Piles

    Term Contract for Special Event and Building Engineering Services in Theme Park

    Term Contract for Construction Works of Builders Trades in Theme Park

    Term Contract for Building and Architectural Works Maintenance Services in Theme Park

  • Sept 17

    Modification of Working Platform at train depot

    Improvement Works to train station

    Survey works for Underground LPG Pipelines at Discovery Bay

    Supply Labour and Material for airplane fuel Tank Base Rim Refurbishment Works

    Anti-Flooding Measures Improvement Works at train station

    Demolition of Temporary structures and Reinstatement Works in the vicinity of train station

    Constrution of Fence Walls and metal gates for Bypass Roadway and Tunnel Building

  • Aug 17

    Finishing Works for Tunnel Ventilation Building

    Replacement of Crane and Associated Equipment on Train Wagon

  • Jul 17 - Aug 17

    Enhancement of Building Facilities in Airport Terminal

  • Jul 17

    Renovation Works for Temporary Office in Airport Terminal

    Design and Build for Exterior Cladding walls and Improvement Works of Commercial Building

    Installation of LED displays at Airport Terminal

    Relocation and Re-provision of Transport Vehicle Compound for sport counter

    Modification Works in train depot

    Waterproofing Works for shoppiong mall

    Renovation Works of Public Toilet in shopping Mall

    Condition Survey of LPG Pipelines at New Territories

  • Apr 17 - Jun 17

    Enlargement Works of Sliding Gate at Theme Park

  • Apr 17

    Replacement and Rehabilitation of Seawater Supply Mains in Airport Terminal

    Provision of Labour and Material for Floor Finished Improvement Works in shopping Mall

    Supply, Design & Installation of Impressed Current Cathodic Protection (ICCP) System for 711mm diameter water pipes

  • Apr 17 - Jul 17

    Provision of Labour and Material for Repartitioning works in shopping mall

  • Mar 17 - Dec 17

    Supply and Installation of Galvanic Anodes and Denso Tape Protection at Container Terminal

  • Jan 17 - Apr 17

    Water Leakage Repair works for Commercial Buildings

2016 Year

  • Dec 16 - Apr 17

    Partitioning works in Airport Terminal

  • Nov 16

    Supply and Install Cable and Containment Connection System for Train Terminal

    Supply and Install Miscellaneous Metal Works for Train Station

  • Nov 16 - May 17

    Installation of Architectural Mosaic Tiles at Stairwell Wall in Train Station

  • Oct 16

    Dismantle, Design, Supply, Installation, Testing and Commissioning of ICCP System for Jetty

  • Sept 16

    Facade Rehabilitation Works for Hotel

  • Aug 16

    Revitalization, Inspection and Temporary Energization of Existing ICCP System in Marine Structures

    Term Contract for General Building Repair and Maintenance Works of various Residental Complexes

  • Aug 16 - Feb 17

    Underground Utilities Repair Works in Theme Park

  • Jul 16 - Nov 16

    Modification of EVA at Auxiliary Building along Train Station

  • Jun 16 - Dec 16

    Modification of Train Wagon for Replacement of Advertising Panels

  • May 16 - Sept 16

    Exterior Rehabilitation Works on Buildings in Theme Park

  • Apr 16 - Jan 17

    Construction of Temporary Bus Shelter for new train station

  • Mar 16 - Dec 16

    Supply and Installation of Galvanic Anodes and Denso Tape Protection at Container Terminal

  • Feb 16 - Sept 17

    Shop Repartitioning Works at Shopping Mall

2015 Year

  • Nov 15 - Feb 16

    Design, Renovation and Construction of Offices and Examination Halls and Alteration and Addition (A&A) Works at airport terminal

  • Nov 15 - May 16

    Upgrading works to Facades of entrances at Shopping Mall

  • Oct 15 - Jun 17

    Install high pressure Main Air Pipes on train wagon

  • Sept 15 - Feb 16

    Improvement works of Unsignalized Pedestrian Crossing for train ststion

  • Aug 15 - Oct 15

    Supply and Install battery recycle bin at train station

  • Jul 15 - May 16

    New DG Store Building Annex to Building

  • Jun 15 - Mar 16

    Renovation and upgrading of AC Workshop at train depot

  • Jun 15 - Nov 15

    Main Contract Works for Carpark at Sport Center

  • Jun 15 - Jul 15

    Waterproofing Works at Theme Park Buildings

  • May 15 - Dec 15

    Enhancement of Steel Bar Trackside Fencing for Train System

  • Apr 15 - Nov 15

    Facade Rehabilitation of Buildings at Theme Park

  • Apr 15 - Oct 15

    Repair, Enhancement and Testing Works for Cathodic Protection System at underwater tunnel

  • Apr 15 - Jun 15

    Design, Supply and Install Electrical Works for bridges

  • Mar 15 - Oct 15

    Driveway Safety Enhancement Works at Theme Park

  • Mar 15 - Aug 15

    Demolition of Existing Pigging Station

  • Mar 15 - Sept 15

    Supply and Install Galvanic Anodes and Denso Tape Protection System at Container Terminal

  • Feb 15 - Oct 15

    Supply and Install high pressure water gun system at both driving cabins on train wagon

  • Feb 15 - Sept 15

    Remedial Works for Damaged CP System at Container Terminal

  • Feb 15 - Nov 16

    Facade Rehabilitation for Buildings in Theme Park

  • Jan 15 - Dec 15

    Maintenance of Corrosion Monitoring System at Pedestrian Subway

  • Jan 15 - Oct 15

    Provision of labour and materials for reflooring works and repainting of road markings at Loading Bays of Shopping Mall

  • Jan 15 - Dec 17

    Term Contract for General Building Repair and Shop Repartitioning Works in Shopping Mall

2014 Year

  • Dec 14 - Feb 15

    Removal of Open Yard UBW & MCB Board for Commercial Building

  • Nov 14 - May 15

    Improvement works for Water Supply System at train depot

  • Nov 14 - Oct 15

    Construction of Shelters for Bus Passengers at various locations

  • Oct 14 - Apr 15

    Construction of Core Store Building

  • Sept 14 - Jan 15

    Replacement of Metallic Chequer Plate in substation

  • Sept 14 - Oct 14

    Supply and install Controller, Indicator and Test Point for ICCP System at piers

  • Aug 14 - Jun 17

    Design, Supply Install Cathodic Protection System to Main Water Pipes

  • Aug 14 - May 15

    Design, Supply. Install, Testing and Monitoring of the Corrosion Monitoring System for Sea Deck Structures

  • Jun 14 - Dec 15

    Design, Supply and Install cp system to Fresh Water Supply

    Design, Supply & Install Cathodic Protection System of the Submarine Effluent Pipes

  • Apr 14 - Dec 14

    Supply and Install Galvanic Anodes and Denso Tape Protection System in Container Terminal

  • Feb 14 - Jul 14

    Repair & Enhancement Works for CP System at underwater tunnel

  • Feb 14 - Apr 16

    Enabling Works for Cathodic Protection System in train station

  • Feb 14 - Jan 16

    Interim Rehabilitation Project at Theme Park

  • Feb 14 - Jun 16

    Hard Landscaping Works around train station

2013 Year

  • Dec 13 - Feb 14

    Installation of Silo with Supporting Frame and Dust Collector

  • Dec 13 - Jun 14

    Maintenance Works for Main Gas Pipe Support at tunnel

  • Sept 13 - Jun 15

    Construction of Pigging Station

  • Aug 13 - Oct 13

    Construction of Extension for Noise Enclosure

  • Aug 13 - Jan 14

    Standby air Scrubbing Unit Installation and Ventilation Improvement Works

  • Aug 13 - Apr 14

    Supply and Install Galvanic Anodes & Denso Tape Protection System at Container terminal

  • Jul 13 - Oct 13

    Window Inspection for large residential development

  • Jul 13 - Jan 14

    Upgrading Works in services tunnel

  • Jun 13 - Nov 13

    Facade Rehabilitation for Buildings at Theme Park

  • Mar 13 - Aug 14

    Supply and Installation of ICCP System on bridges

  • Jan 13 - Sept 14

    Design and Construction Electricity Power Supply and Lightning Protection System for buildings

  • Jan 13 - Aug 13

    Stainless Steel Works E & M Works Internal Fitting Out Works for Equipment Building